Dovіdnik of basic prices for project work in everyday life. Make a call. Sovereign Koshtorisny normative "Dovіdnik of basic prices for project work at the office "Ob'єkti zv'yazku" Dovіdnik of basic prices for the object of zv'yazku

Golovna / Contacts

on project work in everyday life

SBTsP - 2001-02

Make a call

Broken down Vidkritim Aktskiyonerny Comrade "Center for the Scientific and Methodological Termen to the Inszheneriy Super" "Budіvnitvy" (VAT "Centerinvestproekt") Spylno UNITITITITY PROPRAMITY "17 Central Orders of the Office of the Federal Penitentiary Service ). Approved: The Ministry of Regional Development of the Russian Federation by order No. 260 dated "28" January 2010 Registrations: Ministry of Justice of the Russian Federation registration No. 18439 dated "14" spring 2010 Information about the changes to the CBC, clarification and consultations on the supply of the CBC, the reopening of the CBC is available from VAT "TSENTRINVESTproekt" (125057, Moscow, Leningradsky pr. 63; tel. (499) -157-39-42).

1. TOP POSITIONS

1.1. Sovereign Koshtorisny normative “Dovіdnik of basic prices for design work at the “Ob'ekti zv'yazku” (further - Dovіdnik) appointments for the designation of the cost of the development of design and work documentation for the work of the zv'yazku. 1.2. When vikoristannі tsgogo Dovіdnik followed keruvatisya Methodical remarks. 1.3. Riven prices, as in the tables of Dovidnik, were established by the camp on 01.01.2001. 1.4. The base prices for Dovidnik are set in fallowly for natural indications of design objects (Tables No. 1-24) and for total variance of everyday design objects (Table No. 25). 1.5. The base prices of Dovіdnyk indemnified the vitrati for:
  • necessary for the design of the ventilation of the enterprises of the connection, which is to be made;
  • storage of technological and everyday tasks (crime of objects of the city's telephone system).
1.6. The base prices of the Dovidnik, the crime works, re-insurance at paragraph 1.3.6 of section 1 of the Methodical instructions, the design variability is not insured:
  • rozroblennya automatic systems of operational and technical management (ASOTU);
  • works with the programming of switching devices and devices that work with the control of the recorded program (quasi-electronic and electronic).
1.7. Bazova Tsina Projectavnya Bucks more than Pidprimani, wed up to one title (Mizhmika Telech Stanziye with automatic telephone nickname Stanziyu, two atts, Abo-PIMILOSIOSITSIA radio hub and then), roztashovanyh on one or the other maydanchiks, is charged with the sum of the prices for the design work of the skin care. 1.8. The base price for the development of design and work documentation, with the availability of objects in mm. Moscow, St. Petersburg, cities with a population of over 1 million people, are determined by the prices of Dovidnik from the statutory coefficients: in the cities of Moscow, St. Petersburg - up to 1.2; in places with a population of over 1 million cases - up to 1.1. 1.9. The base price for the development of the design of the ob'ektiv zv'yazku in zahisnih spores of civil defense and other special spores is charged for the prices of Dovіdnik іz zastosuvannyam pіdvischuvalnyh koofіtsієntіv zahistu classes:
  • spores IV and V class zakhist - up to 1.2;
  • sporudi class III zakhistu - up to 1.3;
  • spores of class II zakhistu - up to 1.4;
  • spores of class I zakhist - up to 1.6.
1.10. Variety of design work for the life of objects that are included in the scope of the Law of the Russian Federation on 21 April 1993. N 5485-1 “About the sovereign mystery” (with changes on 6 October 1997, 30 worms, 11 leaf fall 2003, 29 cherries, 22 September 2004, 1 March 2007), is charged for the base prices of the design of 'Effective linkage from zastosuvannyam coefficient up to 1.2. 1.11. At the time, the work is carried out to assess the cost of the capital life object in the middle of the city (OVNS) at the warehouse of project documentation for the trustee of the deputy, the varity of these labs is shown at the rozmiri 4% of the total vartost of the design. 1.12. The recommended orienting variant of the distribution of the design documentation (in terms of base price) is indicated in tables No. 28, 30 of the second Dovidnik.

________________________

Price not specified Metodichnі schodo zastosuvannya Dovіdnikіv base tsіn on proektnі robot at budіvnitstvі zatverdzheno instructions to Mіnіsterstva regіonalnogo rozvitku Rosіyskoї Federatsії od 29.12.2009 № 620 "Pro zatverdzhennya methodically vkazіvok schodo zastosuvannya dovіdnikіv base tsіn on proektnі robot budіvnitstvі y" (zareєstrovanі Mіnіsterstvom yustitsії Rosіyskoї Federatsії 23.03., Registration number 16686).

2. PROCEDURE FOR DESIGNATION OF THE BASIC VALUE OF DESIGN ROBOTS

2.1. Submitted the base price for the development of design and working documentation for objects, the prices of which are installed at Dovidnik in a fallow manner according to natural indications, as a rule, it is valid until the indications, pointing at columns 6 and 7, table No. 1-24 of the customs for the weather, between the Vikonavian and the deputy. 2.2. When the base price of the design of the objects is determined according to the table No. 1 of the th Dovіdnik, it is necessary to insure the following features:
  • Tsіnshnikov Elektron ATS, a part of the Yaki Yaki pinking at the musculoskeletal states (OPTS), and Risa - on the Pidstanitsy, is tortured by the PIDSUMOVANNES of the OPTS OPTS for paragraphs 1, PIDSTANSIA, Vydovannoye to the STISTOSKY. ;
  • the prices for the design of electronic exchanges, all of which are located at the substations, are determined by the summed prices for the design of the transit station (TS) after point 8 fallow in the total capacity of all substations, which are included before the TS, then substation 7;
  • the prices of paragraphs 1, 2, 7, 8, 9 did not indemnify the design of the linear disputes between the OPTS (MS) and the substations;
  • the prices of paragraphs 1, 2, 7, 8, 9 are not covered by the distribution of working documentation for the station's electronic exchanges, which are consummated by the supplier plant of the EATS;
  • before the price point 7, reduced coefficients are to be set: the hour of preparation of design documentation for the substation єmnistyu from 1500 to 3000 rooms - up to 0.75, for the substation єmnistyu from 3000 rooms and more - up to 0.6; under the hour of preparation of working documentation for the substation for over 3000 numbers - up to 0.9;
  • when designing a reference station (OPS) of an electronic system, if substations (PS) are not switched on before it, up to the price of station disputes assigned for paragraphs 1 or 2, a reduction in the coefficients is required: when preparing design documentation - up to 0.7; the hour of preparation of work documentation - up to 0.9;
2.3. According to the prices of Table No. 1 of this Dovіdnik, the expenses for the design of the rozpodіlnyh lines of the automatic telephone exchange were not insured. The price of the design of the rozpodіlnyh merezh of the automatic telephone exchange is determined by the relevant tables of this Dovіdnik. The price of the design of the automatic telephone exchange and the substation without rozpodіlchoї merezhі is determined according to the prices of points 1, 2, 7 from the cost of the coefficient to the price of the design of the linear disputes: in the preparation of design documentation - up to 0.9; the hour of preparation of work documentation - up to 0.7. 2.4. According to the prices of the table No. 1 of this Advice, it was not indemnified for the cost of arranging the installation of the automatic telephone exchange. When placing automatic telephone exchanges at the junction of the future, the total price of the design work is calculated according to the sum of the total prices of the design of the station for points 1, 2, 7, 8, 9, 20, 21, 22, 24 - 31, 32 - 37 of the design tables. At any price, such coefficients will be established, which will guarantee the increase in the labor intensity of project work in connection with the development of technological and operational tasks: Appointed higher coefficients are zastosovuyutsya only up to these divisions of the design and operational documentation (linear, station sporud, electric power installations), for which technological developments are carried out. 2.5. With expanded basic ATS without її reconstruction, the price of Table No. 1 of this Dovіdnik varies depending on the magnitude of the increase in tension. 2.6. The prices of paragraph 3 of Table No. 1 of this Dovіdnik are to be set up for the designation of the design work for the operation of the inter-station call (ISC) at the lines with the number of stations not less than three, including the design of the automatic telephone exchange (MTS). 2.7. The prices of paragraphs 3 - 5 of Table No. 1 of this Dovіdnik are to be fixed at the hour of the design of the MCC as an independent title, and at the warehouse of the ATS. The cost of designing ATC and MCC for one title is determined by the sum of the design work costs for the life of ATC and MCC. In case of one-hour projecting in one place of the ATS, at the leather warehouse where MCCs are designed, up to the price points of 3 - 5 days before the preparation of the design documentation, the coefficient of performance up to the labor intensity of work is not more than 0.7. 2.8. The prices for the design of inter-station calls are insured for the additional purchase of the necessary automatic telephone exchanges and the stations obtained without reconstruction of any workshops, including those for calling with the essential automatic telephone exchanges (MTS), as well as the design of transmission systems on the successful lines of the MSS and the ISS. Prices for the development of project documentation for the additional purchase of the GTS for communication with the ATE, which is being designed, is determined by:
  • at the warehouse of the title for the AMTS business - for the prices of points 3 - 6 of the table No. 1 of the same Dovіdnik with a lowering coefficient of the total work more than 0.5;
  • for the final title - for the prices of paragraphs 3 - 6 of table No. 1 of the same Dovidnik with a lowering coefficient for obligatory work not more than 0.55;
  • at the warehouse of the title MCC and the mobile communication hub (MCS) - additionally to the price for the design of the MCC and the ISS according to paragraphs 3 - 6 of Table No. 1 of this Dovіdnik with a reduction coefficient for communication work no more than 0.3 for basic hubs.
The price of distribution schemes for organization of communication and synchronization schemes is charged for points 3-6 of Table No. 1 of this Doc with a coefficient of 0.5. 2.9. According to the main indicator of the design object in Table No. 1 of the Dovidnik - “merezh 1 hub area”, a measure of 1 hub area was accepted up to 100 thousand. numbers 2.10. For high-rise districts, which have one automatic telephone exchange (if it is either designed or not), up to the prices for the design of the MCC for paragraphs 4 or 6 of Table No. 1 of this Dovidnik, the reduction coefficient is reduced to the labor intensity of work no more than 0, 7. 2.11. At the price of point 13 of Table No. 1 of this Dovіdnik, the design of a cable line is insured with a transmission system ІКМ-30 or ІКМ-120 or xDSL modems in the main and project cable ducts independently of the transmission systems according to the number of design cables. Tsіna rods of designed documentary on Budіvnitvai cable linesii Zv'yazka, stall to the witch on the way in the IS-IS-Cable Channeliza, and the Damn-30 Abo-201 ABOMA Modems 13 obsyag works with linear disputes:
  • in the preparation of design and operational documentation no more than 0.85;
  • in case of strengthening by the transmission systems themselves of the main cables, the stretching of the pipeline with a reduction coefficient of the design work with the linear disputes of the troch is more than 0.5;
  • in case of additional supporting cables, previously reinforced with the same type systems, the design price is charged for the price of paragraph 13 with decreasing coefficients: no more than 0.4 to the price of linear spores; no more than 0.3 to the price of electricity (EPU) for the discharge of life without a pavilion; no more than 0.8 to the price of the EPU for withdrawals from the reduced EPU.
2.12. The design price for paragraphs 14 - 19 of Table No. 1 of this Dovіdnik cannot be laid down depending on the type and number of cables that are laid along one route and are calculated from the length of the route. 2.13. Price proektuvannya neuschіlnenoї kabelnoї lіnії zv'yazku sumarno dovzhinoyu Hope 1 km Chastina yakoї held at proektovanіy and Chastina in іsnuyuchіy kabelnіy kanalіzatsії viznachaєtsya Shlyakhov pіdsumovuvannya tsіn, viznachenih vіdpovіdno for tsіnami punktіv 14 - 19 tablitsі №1 tsogo Dovіdnika, vihodyachi of sumarnoї protyazhnostі vsіh a line of distribution lines for design and essential sewerage. With a total length of the route up to 1 km, the price of the design is accepted in accordance with paragraph 14 or paragraph 15. Prices of paragraphs 14 and 15 are not reimbursed for crossing the main highways and airways. 2.14. The price of the project for one title, in one settlement, two and more non-strengthened cable lines from different routes is determined, depending on the total length of the lines of the existing lines, up to paragraph 2.13. of the value of the coefficient, which is more expensive when moving the largest value of the length in the table:
  • over two to three times - 0.8;
  • over three to four times – 0.75;
  • more than chotiri and more - 0.7.
When designing for one title and other routes of a few non-strengthened cable lines in two or more settlements, the price of the design will be deducted from the above-established order for a skin settlement. 2.15. The cost of designing a cable line in a projected single-hole cable duct or in the ground over 1 km is calculated according to paragraphs 16 and 17 of Table No. 2.16. The cost of designing an unstrengthened cable line in the design sewerage system with an average number of channels in a block of over 6 is calculated according to paragraphs 15 - 17 of Table No. The average number of channels at the block of cable ducts depends on the total number of channels in a given area to the total number of channels in a given area. 2.17. Tsіna Project Vuslovikh ATS Visuals at table No. 1 of the Tsoyo Dovidnik PIDSUMOVANEMS TsIN for the project of the Khntsevo station Vidpovyney, in the rooms of the Automatic Romatovs, for Kilkista Zydfik. 2.18. The price for the design of linear disputes of subscriber measures for paragraphs 24 - 31 of Table No. 1 of the Tax Advice for the selection and installation of automatic telephone exchanges is charged in accordance with the prices of paragraphs 7 - 21 of Table No. 9 of the Tax Advice. 2.19. The values ​​of paragraphs 32 - 37 of Table No. 1 of this Dovіdnik are also expanded on the design of nodes in the military-primary quasi-electronic system. 2.20. At the price of paragraph 38 of table No. 1 of this Dovіdnik, the vacancy of additional ownership of up to three automatic telephone exchanges near the district center (point) was insured. With the addition of one automatic telephone exchange at the district center (point) to the price point 38 *** zastosovuєtsya coefficient 0.4. Availability of basic automatic telephone exchanges with automatic number assignment equipment (AVN) at prices point 38 *** not insured, it is charged for the prices of paragraph 23 of Table No. 1 of the same Dovіdnik with a coefficient of 0.7. 2.21. The prices of tables No. 1 of this Dovіdnik did not cover the design of: underwater cable crossings through rivers and other water crossings; perebudovi walls of embankments at river cable crossings; protection of cables against electrocorrosion 2.22. Vartіste Projectavnya Kintsevich installed-vibrantic telephone telephone (PAPS), that number of fraud, that universities of automatic komutasi (at the stagnice of the Elektrzhiville installations) is tortured by the Tsyogo Dovzydniki, . from the list of coefficients:
  • with the capacity of UPATS, numbers: 256 - up to 1.1; 512 - up to 1.15; 1024 - up to 1.2; 2048 and 4096 - up to 1.3;
  • with the capacity of nodes in automatic switching, with good lines: 256/256 - up to 1.2; 512/512 - up to 1.3.
2.23. When the base price for the design of objects is determined, according to Table No. 2 of the second Dovіdnik, it is necessary to insure the following features:
  • the prices of the tables do not cover the design of: - inter-station successful lines; automated diesel power stations; attachment;
  • the prices of paragraph 1 did not cover the design of telegraph channels for the workshop (main, zone and city distribution);
  • the prices of paragraphs 2, 8 and 9 of the table did not cover the design work for the organization of the linear path;
  • in case of designing automated switching hubs, either electronic telegraph substations should be replaced by the EPU, up to the price for the design of the EPU for paragraphs 3 and 4, a coefficient of 0.3 (without the help of the EPU) or 0.8 (with the help of the EPU);
  • the prices of paragraphs 6 and 7 of the table did not cover the design of the lines between the lines and equipment shops (LAS) and the subscriber telegraph;
  • the price of designing a skin foot pad over one set of phototelegraphic equipment for the transfer point, or for the reception of newspapers by the communication channels, is charged additionally for the prices of points 8 and 9 with a coefficient of 0.2;
  • The price of designing the okremih budіvel workshops of the subscriber or phototelegraph is charged for the prices of points 6 and 7 of the type of tension with a reduction coefficient of 0.5.
2.24. When the base price for the design of objects is determined, according to Table No. 3 of the th Dovіdnik, it is necessary to insure the following features:
  • the prices of the tables are not covered by the distribution of project documentation: for the placement of a room (budive), a crim for the storage of a technological and a budding plant; diesel power plants;
  • the prices of paragraphs 6 - 8 of the table do not cover the design of: line equipment shops; station type MRU-M and vuzlіv napіvavtomaticheskogo zv'yazku; inter-station calls with local and international telephone exchanges, the price of which is determined additionally for the prices of the main inter-station calls in Table No.
  • the number of channels for points 6 - 8 of the table is determined by the sum of the channels of the main lines and the line of the zonal connection, and for points 9 - 11, no more is accepted, lower than 130% of the capacity of the stations to be installed;
  • The kilki of the installations of the additives of the telegraph nobile nobility of the telegraphic zavazhok behind paragraphs 1 - 3 for Kilkіstya Canal, the MTS sub -nunits of the installed stanitous sprinkle is included in the dumplings of the MTS systems of the dimensions of the dimensions of the dimensions, (width, height). The number of installations depends on the skin apparatus;
  • the number of channels seen by AMTS for points 4 and 5 is assigned to the sum of intermediary channels and cord sets in the station;
  • the prices of paragraph 13 of the table do not cover the distribution of project documentation: for the design of automated call centers and the additional acquisition of an essential AMTS for communication with the OCC; for the arrival of a place (budive), a crim of the warehouse of a technological and budive plant; diesel power plants;
  • the prices of point 13 were transferred to the design of the switching-line equipment and the switching workshop with the possession of an automated work station (AWS);
  • in case of one-hour projecting for one title of ACC and AMTS/ATS, the price of development of design documentation is charged to the sum of the design variance of AMTS/ATS and ACC from the cost of reducing the coefficient to the price of ACC for communication and projects of changes in labor costs;
2.25. The number of connection points for point 14 of Table No. 3 of this Dovіdnik is determined by the summation point of connection of trunk lines, lines of zonal communication, with lines from local automatic telephone exchanges, subscriber space for necessary concentration (crym, included). The prices of paragraph 14 of Table No. 3 of this Dovіdnik did not indemnify the design:
  • inter-station calls with local and international telephone exchanges, the price of which is determined additionally for the prices of the main inter-station calls in Table No.
  • linear disputes with successful lines;
  • working documentation of any station disputes AMTS / automatic telephone exchanges, which are checked by the supplier plant.
2.26. When the base price of the design of the objects is determined according to the table No. 4 of the th Dovіdnik, it is necessary to insure the following particularities:
  • The length of the Magistered cable linii Zv'yazka (MKLZ) is tortured along the VIDSTAGS MIZH Kinsevimi points without urahuvannya Dovzhini cable liniy, and the zystykhi rings (osiyami navigs ( 'yazku (RUS, GUS). centers (TC);
  • at the prices of paragraphs 1 - 5, the design for the MKLZ with a long-term substation of 3 km and a length of: 1000 km - two service substation points (POUP) and 3 containers, 500 km - 1 POUP and 1 container, 350 km - 1 container;
  • for MKLZ with a dovezhinoyu pіdsilyuvalnoї dolyanka 6 km and length: 1000 km - 2 POUP and 2 containers, 450 km - 1 POUP;
  • by the prices of the tables, the placement of terminal points at the main houses, and at the design stages of new houses, the price of the development of design documentation for new houses is determined additionally;
  • vidіlennya kanalіv zv'yazku, movlennya and telebatchennya at intermediate points of cable lines zv'yazku prices of the table are insured;
  • tsіni tsієї tablesі do not lie in the number of designed transmission systems;
  • the prices of the tables do not cover the design of: return lines to points in the main cable line to MTS (RUZ, GUS, KU and others) from transmission systems; crossing waterways and channels; telegraph and international telephone exchanges; intermediate transfer points; living quarters and objects of socially-button recognition; water towers;
  • The prices of the tables are to be paid for the variability of the distribution of technological and weekday tasks for the appointment of a business (accommodation), the provision of points at the necessary obligations, the preparation of weekend data for the contract and the work with the contract.
2.27. The prices of paragraphs 1 - 5 of Table No. 4 of this Dovіdnik did not indemnify for the design of railing nodes and railing stations. The price of the design of the MKLZ, which can be at the warehouse of the merging plant and the merging station, depends on the sum of the prices for the design of the skin lace knot and the skin lace station for the prices of table No. If so, the price of the design of the substation or the station that is being replaced is included. 2.28. By the prices of paragraphs 7, 8, 9 of Table No. 4 of this Dovіdnik, the design of cable lines of the seen connection in the main or design of the telephone sewer with the laying of one - three cables in one route was awarded. The price of the design work for laying on one cable route over three is charged additionally for the prices for cable lines, not limited to tables No. When designing for one title of a number of independent ones, one in one cable line, a visible connection for paragraphs 7, 8, 9 of Table No. 4 of the Dovidnik from different routes double tabular. prices with a reduction factor of 0.8. When designing for one title and different routes of several cable lines, a connection is seen at two and more settlements, the price of the design is calculated from the proposed order for a skin settlement. 2.29. By the prices of paragraphs 10, 11 of table No. 4 of the th Dovіdnik, it was indemnified: the weather forecast was determined by the interests of the organizations; designing cable crossings across rivers and lakes using the horizontally straightened drilling method. 2.30. The values ​​of paragraph 12 of Table No. 4 of this Dovіdnik transfer the placement of terminal stations at ready-made houses (accommodations) with obvious electrical supply and do not insure the variability of the distribution: when you enter at the right time of possession of the electric and mechanical inlets; documentation for the appointment of a budіvel (appointment). The price of the table is not covered by the design of the return lines to the points of the main cable line to the MTS (RUS, GUS, KU and others). 2.31. When the base price of the design of the objects is determined according to the table No. 5 of the th Dovіdnik, it is necessary to insure the following features:
  • the prices of paragraphs 1 - 3 of the table insured the design of a new technical building of a pit-type framing unit of the excavated type and adjacent to the new protection of spores on the routes of engineering communications near the borders of the Maidanchik of life;
  • Values ​​of paragraphs 1 and 2 of the tables are to pay for the design of the unit for 10 ths. w.h. kanalіv linіyny tract, and point 3 - from 17 yew. w.h. canals. Skin design price 1000 c. ducts should be assigned additionally by a stosuvannya coefficient of 0.05 to the price of the design of the station;
  • Prices 1 - 3 tsієї tablesі not insured for the design of: міжміїїїєїї мініх хрупровій міжміїй міжміїї telephony zv'yazok; garages and garage disputes; water towers; refrigeration centers; warehouses and navіsіv, how to stand still; administrative and technical life of the RKRM; blocks of virobnichih meisteren;
  • the prices for the design of tie-rods (SS) are insured for the design of diesel power plants of offensive intensities: for SS with a volume of work 7 ths. m 3 - 2-200 kW, for SS with a volume of work 10 thousand. m 3 - 2-200 kW, for SS with a volume of work 20 thousand. m 3 - 2-200 kW.
2.32. When the base price of the design of the objects is determined according to the table No. 6 of the th Dovіdnik, it is necessary to insure the following features:
  • the prices of the tables do not fall due to the number of designs for one route of cables and the number of transmission systems;
  • the cost of designing an unstrengthened redundant line of connection on the design supports from a quantity of lanciugs on one route and more is charged for the prices of points 2 or 3 with a coefficient of 1.23 independently in lanciugs;
  • for the price of one lancet of the reversed line, the total price of all the design lines of the same lancet is accepted;
  • the prices of the tables are not covered by the distribution of design and work documentation for the connection of the terminal points of the overhead and cable lines;
  • the prices of paragraphs 2 and 3 transferred the cost of standard projects of structures to the support and did not indemnify for the design of a sleeper support of the line radio on the design supports of the repeated line link;
  • Tsіna Projectovnia behind one title, in one settlement of the coward of the cable lineniy linii stars on the rihiznikh tracks, to Vymarniy, the long -standing tracks to the tsnya, the dorivniye. three times - up to 0.9, over three times up to four times - up to 0.8, over two times - up to 0.75.
When designing for one title and other routes of several cable lines, the connection at two and more settlements, the price of the design is determined by the established order for the skin settlement. 2.33. When the base price of the design of the objects is determined according to the table No. 7 of the th Dovіdnik, it is necessary to insure the following features:
  • when designing automated radio broadcasting hubs with remote monitoring up to the prices of points 5, 6, a coefficient of 1.35 is required;
  • the prices of paragraphs 1, 2, 4, 5, 6 of the table do not cover the design of: installations for shifting promotions and sound reinforcement in the halls; current studios; pristosuvannya budіvel (appointment); radio coverage of other settlements, which are installed in the projected radio hub.
2.34. When the base price for the design of objects is determined, according to table No. 8 of the th Dovіdnik, it is necessary to insure the following features: 2.35. When the base price for the design of objects is determined, according to Table No. 9 of the second Dovіdnik, it is necessary to insure the following features:
  • tsіnami tablitsі slіd koristuvatisya schodo tsіni proektuvannya vіdpovіdnih zasobіv zv'yazku on dіyuchih pіdpriєmstvah, budіvlyah, sporudah, zdіysnyuvanogo for okremim zavdannyam zamovnika, i have navіt vipadkah, if vartіst proektuvannya zaznachenih in tablitsі zasobіv zv'yazku not vrahovano tsіnoyu rozrobki dokumentatsії proektovanogo pіdpriєmstva, budіvlі , spore;
  • the price of the design of linear pipelines, necessary for the laying of complex communication lines and the transfer of information to the industrial maidanchik (pipelines, sightseeing outbuildings) is covered by the prices of points 7 - 10;
  • the prices of paragraphs 11 - 14 did not cover the design of linear spores, necessary for the laying of complex communication lines and transmissions of information in the middle of the bud and spores (trays, zholobi, channels, pipes, hatches, pull boxes, etc.), which are charged additionally for the prices - 21;
  • at the prices of paragraphs 7 - 21, the following types of design work were awarded: after paragraphs 7 - 10 - development of the plan for the distribution of routes on the general plan, schemes for the distribution of complex meshes, schemes for the distribution of shafovy districts, for paragraphs 11 - 14 - development of the plan for the distribution of the installation of the construction, metal construction complex measures, after paragraphs 15 - 21 - development of a plan for the distribution of pipeline routes, trays, etc. that technological plant at the outpost outbuilding;
  • at the cost of paragraph 26, the next project work was awarded: the cost of the required number of sirens, the installation of a shackle (block) at the control point, the laying of cables, the connection of electricity, the armchairs for installing sirens.
The price for the development of design documentation for the civil defense control point (GO) at the price of paragraph 26 is not covered and is charged additionally. 2.36. When the base price of the design of the objects is determined according to the table No. 11 of the th Dovіdnik, it is necessary to insure the following features:
  • - Prices do not expand on radio relay lines (RRL) overhead, above water, roaming under the ground;
  • - the price for the design of RRL, MK RRL and TRRL for the length of less than tabular indications (40 km of points 1, 4 and 170 km of point 3) is charged for the price for the value of 40 km and 170 km in total. With an average long interval between stations of less than 40 km for points 1, 2, 4 and 170 km for point 3, a coefficient is established that will increase the amount of 40 km or 170 km to the length (in km) of the projected average interval;
  • - the prices given in the table are not covered: RRL renewal, which includes the security of services for the restoration of calls in emergency situations, the distribution of the electromagnetic system, the telecommand of the possessions, the installation of radio and television stations, at telephone repeaters;
  • - the prices of point 3 of the table are not covered by sound insulation, acoustic work and air conditioning;
  • - the price of the distribution of supports under the antennas by the prices of the table is not guaranteed and is charged additionally for the prices of the table No. 16 of this Dovidnik;
  • - the prices of points 1, 2 are installed on the design of main, zonal, internal ozone, local radio relay stations and broadband subscriber access at the terminal warehouse (ORS), hub (URS), intermediate (PRS) radio relay stations, basic and long-term emergency and preventive services ) and to all wide-range equipment in the 2 GHz bands and more, which allows the organization of television and telephone trunks, trunks of a hot reserve. Prices are stastosovuyutsya independently from the day and the number of stovburiv.
2.37. When the base price for the design of objects is determined, according to Table No. 12 of the th Dovіdnik, it is necessary to insure the following features:
  • the tightness of the transmission stations is measured in total, zokrema: the first ones - for the telephone mode, the others - for the telegraph mode;
  • one priymalny attachment is accepted for chotiri smart calls;
  • prices do not extend to objects of transfer, underground, surface water, underwater and special recognition;
  • the prices in the table are not checked: moving studio, control and dispatching center (CDP), equipment radio bureau, equipment RRL, equipment switching and distribution (KRA), auditory, soundproof, phototelegraph and auto exchange, technical and special equipment control, management ; telecontrol of possessions; utilization of heat from technological processes;
  • according to the prices of the tables, air conditioning is insured at radio stations without stopping refrigeration machines;
  • the price of the design of antenna-spherical spores (AMS) by the prices of the table is not covered and is charged additionally for the prices of the table No. 17, 18 of the second Dovidnik;
  • For example, projects for the UBS antenna switching system are implemented with the help of a complete factory set, the prices of points 7 - 14 do not stop, and the work with the UBS at various stages of the design is included in the technological part of the price for points 1, 2, 3 of the table.
2.38. When the base price for the design of objects is determined, according to table No. 13 of the second Dovіdnik, it is necessary to insure the following features:
  • The prices given in the tables do not cover the design of the hardware: joint technical control; transfer TV station (PA PTS); radio relay station (RRS); UKKh zv'yazku z ruhomimi objects; calls from the shopping center; special call;
  • the prices of the tables are not insured by telecontrol and automatic installation of fire extinguishing, fire and security alarms;
  • according to the prices of paragraph 1 of the table, air conditioning is insured without stopping refrigeration machines;
  • the prices of point 2 of the table are not insured for air conditioning;
  • the price of the design of the antenna-spherical spores (AMS) is not covered and is charged additionally for the prices of the table No. 17,18 of this Dovidnik;
  • at the prices of point 1 of the table, the design of radio-television transmission stations (RPS) with the installation of transmissions over 1 kW for two or three televisions (TV) and up to four programs of radio communication (RT) in the UKH band was awarded. The cost of designing RPS from the number of programs to be assigned depends on paragraph 1 of the zastosuvannyam of the upcoming coefficients: for four TB and up to four RV programs - 1.3; for multiple TB and up to six RV programs - 1.4; for chotiriox TB and up to eight RV programs - 1.5; for five TVs and up to a few RV programs - 1.5; for five TB and up to six RV programs - 1.6; for five TB and up to eight RV programs - 1.7; for six TVs and up to a few RV programs - 1.7; for six TV and up to six RV programs - 1.8; for six TV and up to eight RV programs - 1.9;
  • the prices of point 1 of the table of the table are not insured to the organization for RPS radio communications in the ranges of short, medium and long waves (HF, MW and LW);
  • at the prices of paragraph 2 of the table, the design of radio-television repeaters (RTR) with the installation of transmissions with an intensity of up to 0.5 kW on two television programs was awarded. The cost of designing the RTR from the number of programs over two is determined by paragraph 2 from the stagnation of the upcoming coefficients: for three TV programs - 1.4; for some TV programs - 1.4.
2.39. When the base price of the design of the objects is determined according to the table No. 14 of the second Dovіdnik, it is necessary to insure the following features:
  • the prices do not cover the design of a radio-television repeater, a radio relay station (RRS), a hardware sewer, refrigeration machines and installations containing rare nitrogen;
  • the price of the design of the supports under the antenna is not covered and is charged additionally for the prices of the table No. 18 of this Dovidnik;
  • the cost of designing in digital and telephone communication systems is determined by the prices of points 1 - 3 of the table from the cost at all stages of the design of the coefficient - 1.5;
  • The variability of the design of the earth station is determined by the prices of points 1 - 3 of the table from the cost of the required stages of the design of the coefficient - 0.5.
2.40. When the base price for the design of objects is determined, according to table No. 15 of the second Dovіdnik, it is necessary to insure the following features:
  • by the prices of points 1 - 4, the design variant of the base station is insured, to the warehouse, which includes the transmission, acceptance and control point;
  • the cost of designing in digital and style communication systems is charged for the prices of paragraphs. 1 - 4, 6 and 7 for all stages of the design of the coefficient - 1.7;
  • The prices of the tables do not cover the design of the switching center for a dry call (CKPS).
2.41. When the base price for the design of objects is determined, according to Table No. 16 of the th Dovіdnik, it is necessary to insure the following features:
  • telecommand is not insured by prices;
  • prices insured air conditioning without stopping refrigeration machines;
  • in case, if following the norms of the future and technological design, or following the minds of the future maidan, a small number of buds (blocks) are split up, which enter the warehouse of the design enterprise, the price of the design of this enterprise is set as the sum of the prices (block of the week of the project).
2.42. When the base price of the design of the objects is determined according to the table No. 17 of the th Dovіdnik, it is necessary to insure the following features:
  • the prices do not cover the design of the mechanisms for lifting, lowering and looking around the antennas, modeling the antennas, testing the last elements of the antennas, the elements of the antennas;
  • the design variability of the short-wave antennas is determined by the prices of points 8 - 10, depending on the number of vibrators;
  • the design variability of the design of the primary antennas of the second and middle ones is determined by the prices of points 1, 3, 4 from the cost of all stages of the design of the coefficient 0.6;
  • when designing an antenna, the average dovgohvilovoj is straightened out with the number of viprominuvachiv, one to the number of point 1 of the table, the coefficients are determined: with the number of viprominuvachiv 2 - 1.4; from the number of viprominuvachiv 3 - 1.6;
  • when designing an antenna for dovgokhvilovoj with a roiled dart netting with a quantity of viprominuvachiv 6 up to the point 2 of the table, a coefficient of 1.2 is required;
  • when designing a medium-width straight-lined antenna, the coefficients are to be determined: for the number of viprominuvachiv 2 - 0.7 to the value of point 3; from the number of viprominuvachiv 27 - 1.3 to the value of point 4; from the number of viprominuvachiv 40 - 1.6 to the value of point 4;
  • for points 5 - 7, when designing an antenna, the coefficients are to be set: from the number of vibrators 2 - 1.0 to the value of point 5; from the number of vibrators 8 - 0.6 to the value of point 6; from the number of voters 32 - 0.6 to the value of point 7;
  • The price of designing a two-sided antenna, which is made up of two antennas of the same type (for constructive, design, height and electrical parameters) and stowing on top supports, is charged for the price of designing a one-sided antenna due to a factor of 1,4.
  • The prices of points 1 - 7 are insured for the design of antennas for an intensity of up to 500 kW. When designing antennas for an intensification of over 500 kW, the following factors are required up to prices: - for intensities of 501 to 1000 kW - 1.2; with tensions from 1001 to 2000 kW - 1.4;
  • when designing antennas for UKH radio communication, the following factors are required: for the number of vibrators 2 - 0.6 up to the value of point 8; from the number of vibrators 8 - 0.7 to the value of point 9; from the number of voters 32 - 0.72 to the value of point 10;
  • at the cost of point 11 of the table, the design of a system of antenna-feeder attachments (AFS) for two or three television (TV) programs and four radio programs (RV) in the UKH range was awarded. The cost of designing the AFU with the number of programs for the number of appointments depends on paragraph 11 of the zastosuvannya coefіtsіentіv: for chotiriox TB and to chotiriox RV programs - 1.3; for multiple TB and up to six RV programs - 1.4; for chotiriox TB and up to eight RV programs - 1.5; for five TVs and up to a few RV programs - 1.5; for five TB and up to six RV programs - 1.6; for five TB and up to eight RV programs - 1.7; for six TVs and up to a few RV programs - 1.7; for six TV and up to six RV programs - 1.8; for six TV and up to eight RV programs - 1.9;
  • Tsіna Project -fyderenny Lіnіy in one Potoci, ShO PIDVAST IN THE MASTROUSS SOLD SAME OF THE SPILNII TRADE (cable LINI), Wound up for the central album of the dummies of 12-21 Keephizti: at the city of Keephiyti: at the city of Keephi -Lyni: at the city of LICHITS: at the same time with three lines in the sweat - 1.2; with over three lines in sweat - 1.3;
  • by the prices of paragraphs 22 - 29 of the table, the design of a single feeder line with a length of up to 50 meters between the antenna and the extension of the installation and connection of the feeder line to the antenna was insured.
2.43. When the base price for the design of objects is determined, according to table No. 18 of the second Dovіdnik, it is necessary to insure the following features:
  • the prices did not cover the design: looking around the Maidanchiks, the cafe is too thin; lift lifts and lift mechanisms; descent and look at the antennas; mechanisms and systems for installation and maintenance of support and antennas; modeling and testing of the last zrazkіv supports, support elements;
  • when designing supports with possible expansion, they have lift winders up to the values ​​of points 1 - 3 of the table, the coefficients will be fixed: 1.1 - hour of preparation of work documentation; 1.07 – half an hour for the preparation of project documentation. Coefficients of protection are made by working from supports, but not by designing pidomnikiv and technical premises (cabins). The increase in prices is calculated as a complex price and expands only on the technical and economic part, metal structures, supports and foundations;
  • in case of a split design with supports in the construction of technical facilities (or cabins) up to the prices of points 1 - 3 of the table, the coefficients are determined: 1.3 - hour for the preparation of work documentation; 1.2 – half hour for the preparation of project documentation. Coefficients of protection are made by working from supports, but not by designing pidomnikiv and technical premises (cabins). The increase in prices is calculated as a complex price and expands only on the technical and economic part, metal structures, supports and foundations;
  • when designing supports, which are included in the system of intersecting structures, up to the prices for items 1 - 3 of the table, the coefficients are set: 1.3 - hour of preparation of working documentation; 1.2 – half hour for the preparation of project documentation. The increase in prices is calculated as a complex price and expands only on the technical and economic part, metal structures, supports and foundations;
  • for different projects, the support for different functions (for example, television equipment at the RRL warehouse), the price for all stages of the design is charged for the price of points 1 - 4 for the main support with a coefficient of 1.5;
  • the prices do not expand on the support of the transfer, the selection and selection, which are fluffy, and also on the support above the values ​​​​in the tables of maximum values;
  • when designing fences around the perimeter of the support, up to the point 1, the following coefficients are required: 1.1 - when preparing design documentation; 1,2 - half an hour of preparation of working documentation;
  • The cost of designing a feeder bridge with a length of less than 10m is charged for a price of 10m.
2.44. When the base price of the design of objects is determined, according to table No. 19 of the second Dovіdnik, it is necessary to insure the following particularities:
  • prices indicated for the skin stage of design;
  • for systems with ruhomimi objects up to prices, the coefficient is fixed - 1.75 for items 1 - 4 of the table;
  • the design variance of the electromagnetic system (EMS) of the earthly stations is determined by the prices of points 5 - 12 of the table from the cost of the coefficient 0.6;
  • the prices for items 5 - 12 of the table for the electromagnetic sum of the receiving-transmitting earth stations of the satellite transmission systems (ZSSSP) of the "Ekran" type are not extended;
  • for the prices of paragraphs 17 - 26 of the table in the ranges of NE and LW, the number of antennas is taken for the number of viprominuvachiv;
  • the values ​​of paragraphs 1 - 46 of the table are to be assessed once at any stage of design work with the possibility of a good podіl according to the stages of work;
  • The values ​​of the tables do not vouch for the correction of object coordinates.
2.45. When the base price of the design of the objects is determined according to the table No. 20 of the second Dovіdnik, it is necessary to insure the following features:
  • the variability of designing the existing installations of the industrial television installation of the object is determined by paragraph 7 of the table of the quotation of the coefficient - 1.1;
  • The prices of paragraph 10 of the table do not cover the design of cable lines for the transmission of video information to external cameras, cable ducts, where it is possible to stand supports (shcheogl) for installing cameras.
2.46. When the base price of the design of the objects is determined according to the table No. 24 of the second Dovіdnik, it is necessary to insure the following features:
  • under the university of measure rahuvati: a set of personal EOM (for the complete set, which allows PEM to work offline); working station of local storage, storage printers, storage monitors, storage storage and other extensions; task of porting the active setting of the local enumeration measure (LAN); information sockets of the structured cable mesh (SCS), rear ports of the commutation control of the SCS. The variability of the design of scrap, which is based on the resources of the SCS, is determined by the different price lists with a reduction factor K = 0.7.

_______________________________

1. Light position
2. The procedure for determining the base price of design work in the fallow land according to natural indicators of design objects
3. The procedure for determining the base price of design work in the field
4. Basic prices for the development of design and work documentation
Table 1. Moscow telephone networks
Table 2. Documentary electrical communication
Table 3
Table 4. Cable lines
Table 5
Table 6
Table 7
Table 8
Table 9
Table 10
Table 11
Table 12. Transmitting and receiving radio stations
Table 13
Table 14. Earth stations of satellite transmission systems
Table 15
Table 16
Table 17
Table 18
Table 19
Table 20
Table 21
Table 22
Table 23. Protection of information systems, communication systems and telecommunications
Table 24
Table 25
Table 26
Table 27
Table 28
Table 29
Table 30
Table 31
2. The procedure for determining the base price of design work in the fallow land according to natural indicators of design objects
3. The procedure for determining the base price of design work in the field
4. Basic prices for the development of design and work documentation
Table 1. Moscow telephone networks
Table 2. Documentary electrical communication
Table 3
Table 4. Cable lines
Table 5
Table 6
Table 7
Table 8
Table 9
Table 10
Table 11
Table 12. Transmitting and receiving radio stations
Table 13
Table 14. Earth stations of satellite transmission systems
Table 15
Table 16
Table 17
Table 18
Table 19
Table 20
Table 21
Table 22
Table 23. Protection of information systems, communication systems and telecommunications
Table 24
Table 25
Table 26
Table 27
Table 28
Table 29
Table 30
Table 31

POWERS OF REGULATIONS

RUSSIAN FEDERATION

Basic price guide

on project work in everyday life

SBTsP - 2001-02

Make a call

Moscow 2010

REGISTERED: Ministry of Justice of the Russian Federation registration No. 000 dated "14" Spring 2010

Information about changes to the CBC, clarification and consultations on the nutrition of the CBC, respawning of the CBC zdijsnyu (125057, Moscow, Leningradsky pr. 63);

Head position .................................................. ..……….............
fallow in the form of natural indications of the objects of design …………………………………………………….
The procedure for determining the base price of design work
fallow in the stale vartost of everyday life ……………

Basic prices for the development of the project

that work documentation …………………………………………

Table number 1.

Russian telephone lines……………………

Table number 2.

Documentary electric sound………………….

Table number 3.

Міжмісі telephone stations………

Table number 4.

Cable lines for communication………………………

Table number 5.

Merezhev University………………………………………

Table number 6.

Sіlskі telephone networks……………………

Table number 7.

Table number 8.

Objects of postal communication (regional hubs, local and strong departments) ………………

Table number 9.

Okremi installations and spores

wired call………………………………..

Table number 10.

Rozrahunka infusion of electromagnetic induction

Table number 11.

Radio relay lines for communication ………………….

Table number 12.

Transmitting and receiving radio stations ….….

Table number 13.

Radio-television transmission stations.

Table number 14.

Earth stations of satellite systems

transmission ………………………………………...

Table number 15.

Systems of telephone UKH radio communication with ruhomimi objects …………………….…….

Table number 16.

Apparatus-studio complexes of telecentres, radio booths, radio telecentres …………...

Table number 17.

Antennas, feeder lines, hvilevodni paths for radio communication objects,

radio and television broadcasting……………….…

Table number 18.

Steel supports for radio communication objects,

radio and television broadcasting…………………

Table number 19.

Electromagnetic summіsnіst (EMC),

sanitary protection zones (SPZ), zones

obmezhennya zabudovi (ZOZ), areas covered by radio communications

radio communication……………………………………..…...

Table number 20.

Okremі budіvlі tsevіv ta sporudi

radio communications, radio communications

and TV station…………………………………

Table number 21.

communication system and telecommunications………..…

Table number 24.

Local counting measures,

structured cable lines……..……

Table number 25.

Zalіznіchnі і mіskі postamti, vіddіlennya poshti …………………..

Table number 26.

documentation of salaries

that mіskh postamtiv, vіddіlennya transported post ………………………………………………

Vіdnosna vіdnosti razrobіlі razrobіlіv project dokumentії budіvel

that sporud ob'єktіv zv'yazku (for vіdsotkі vіd basії tsіni) …………………………………..…

it is notable the versatility of the distribution of the working documentation, and the spores of the object of communication (in the case of hundreds of base prices) ..................................

the variability of the distribution of the distribution of the working documentation of the line objects of the call is notable (in the case of hundreds, the base price is included).


1. TOP POSITIONS


1.1. Sovereign Koshtorisny normative “Dovіdnik of basic prices for design work at the “Ob'ekti zv'yazku” (further - Dovіdnik) appointments for the designation of the cost of the development of design and work documentation for the work of the zv'yazku.

1.2. When vikoristannі tsgogo Dovіdnik next keruvatisya Methodical remarks *.

1.3. Riven prices, as in the tables of Dovidnik, were established by the camp on 01.01.2001.

1.4. The base prices for Dovidnik are set in fallowly for natural indications of design objects (Tables No. 1 - 24) and for total vartost of everyday design objects (Table No. 25).

1.5. The base prices of Dovіdnyk indemnified the vitrati for:

· Necessary for the design of air supply for airborne enterprises;

· Storage of technological and everyday tasks (Crimea of ​​objects of the Moscow telephone system).

1.6. The base prices of the Dovidnik, the crime works, re-insurance at paragraph 1.3.6 of section 1 of the Methodical instructions, the design variability is not insured:

· Development of automatic systems for operational and technical management (ASOTU);

· works with programming of switching attachments and attachments that work with control over the recorded program (quasi-electronic and electronic).

1.7. Bazova Tsina Projectavnya Bucks more than Pidprimani, wed up to one title (Mizhmika Telech Stanziye with automatic telephone nickname Stanziyu, two atts, Abo-PIMILOSIOSITSIA radio hub and then), roztashovanyh on one or the other maydanchiks, is charged with the sum of the prices for the design work of the skin care.

1.8. The base price for the development of design and work documentation, with the availability of objects in mm. Moscow, St. Petersburg, cities with a population of over 1 million people, are determined by the prices of Dovidnik from the statutory coefficients: in the cities of Moscow, St. Petersburg - up to 1.2; in places with a population of over 1 million cases - up to 1.1.

1.9. The base price for the development of the design of the ob'ektiv zv'yazku in zahisnih spores of civil defense and other special spores is charged for the prices of Dovіdnik іz zastosuvannyam pіdvischuvalnyh koofіtsієntіv zahistu classes: