Introduction to the industrial exploitation of state standard information systems. Appointment of guests under the hour of designing information systems. Putting the information system into operation

Golovna / 2 Cool Readers

Putting the information system into operation consists of the following stages:

  • 1) commissioning technical aids;
  • 2) commissioning program contributions;
  • 3) training and certification of personnel;
  • 4) carrying out subsequent operation of all components of that system as a whole;
  • 5) the building is put into operation and the signing of the acts of acceptance-building works.

The information system has been broken down by us minimal benefits to the technical characteristics of hardware and software features:

  • -single-core processor with a frequency of 2 GHz;
  • -RAM DDR - 512 MB;
  • -video card - pidide be-yak today;
  • -1 GB space on hard disk;
  • - Monitor, keyboard, mouse;
  • -installed operating system Windows 98/XP/Vista/Seven.

Skills at BAT "Kirovoenergozbut" currently have similar databases (our database is a synthesis of 2 basic databases), then special training for personnel in the implementation of new basis data is not needed.

After entering into the data base of the enterprise, it is completely ready for operation.

Operation of the information system

This robot was trying to maximally ask the robot for the help of the helper information system “The Shape of Robots with Clients” of the BAT “Kirovenergozbut”. Oskіlki program rassnіє tables, it was necessary to expand the navigation system manually, ask, add that remote records, fold zvіtіv.

Don't be surprised at those that the program doesn't help technical characteristics like a computer, no matter how victorious, the program is not guilty of revenge on a great number of side elements.

At the start of the program "Shape of Robots with Clients", a form will appear, as a way to propagate the robot with the tribute of BAT "Kirovenergozbut".

If you need data about the borzhniki of the VAT "Kirovoenergozbut", then click on "Borzhniki". A new form "Borzhniki" is being introduced, for additional help you can know, add, change or remove the required parameter.

When pressing the “Change” button, clicking behind the line on the required row in the table and changing the data, the data of the designated row will be fixed in the table. If you want to add new data to the tables, enter new data for the specified field. Why press the "Add" button and new entries appear in the database. In the "Search" field, you can find out the information you need for one or more parameters by entering the data and pressing the "Search" button. So, having seen the row at the table and having pressed the button “View” from your list, you can see the needs and all the data about the new one. If you want to turn to the cob shape, press “Leave”.

On the head form, there are also buttons that open access to data about post-employees (“Post-appointers”), about contracts (“Contract”), about spivrobitnikiv (“Spivrobitniki”), about supporters (“Spozhivachі”). All forms that are displayed, also press the buttons "Add", "Change", "Vidality", "Poshuk", "Call", "Exit".

If you want to exit the program, then press the "Exit" button on the main form.

The program has entered the exchange for changing the interface, the access of the correspondent to the buttons "Add", "Change", "Visuality", rechecking for the validity of the data entered to the parameters of the table, rechecking for the maximum amount of data entered.

Prospects for the development of the information system

At this stage, we have created an information system to insure the robot with the clients of the BAT “Kirovoenergozbut”, with the postal workers, seen in the same category of laborers of the Partnership, who will ask the robot for their joke. When the data of the information system was combined, a test was made to unite 2 data bases, which are currently valid for the health workers and all the partners of the Partnership.

Nadalі to it can be added new possibilities of how to create an advance for workers, appearance of servants, which are expected in accordance with the contract, elements of accounting appearance, the possibility of integrating data with 1C: Acceptance is just.

APPROVED

Intercessor of the Director of the Department of State Regulation of the Economy

Ministry of Economic Development Russian Federation
______________ V.M. Rudenko
« 09 » _ leaf fall __ 2011

ACT OF INTRODUCTION INTO LIMITED OPERATION

Automated information system for project management, developed under a sovereign contract on November 7, 2011. No. DK-158-OF/D01.
Vіdpovіdno until the joint decision of Zamovnik (Ministry of Economic Development of Russia) and Vikonavtsia (TOV "OTR 2000") to put into operation.

Warehouse commission:

Commission heads:

Intercessor of the Director of the Department of State Regulation of the Economy V.N. Rudenko,

Commission members:

Vikonuvacha obov'yazkіv head of vіddіlu development of electronic partnership to the Department of sovereign regulation in the economy S. V. Pushakov,

Head of the Department of State Regulation of the Economy A.V. Matvenko,

Provid consultant for the development of electronic partnerships to the Department of state regulation of the economy N.N. Kirsanovskaya,

Kerivnika directly TOV "VTR 2000" A.I. Kulishova,

Book of projects of TOV "VTR 2000" O.V. Strakhova,

Conducted analyst TOV VTR 2000 Yu.M. Gudkovy,

Scientific reference book directly "Real sector" IEP named after E.T. Gaidara E.R. Batarshin.
in the period s "_ 08 _" leaf fall 2011 rock by "_ 09 _" leaf fall 2011 carried out a preliminary testing of the applied software for the automated information system "Project Management Portal" (AIS PPU), installed in the Ministry of Economic Development of Russia.


  1. The previous trial was recognized as successfully completed.

    1. The main stages of the development of the vykonanі vіdpovіdno to the technical department.

    2. Broken down documentation exploitation of software

    3. Software security is prepared to final operation.

  1. The list of functions that are accepted for the last operation (divided "Vimogy to functions that are considered by the system" of the technical task):

    1. Conducting a transfer of projects.

    2. Robot from design entities.

    3. I will work with the indicators of the assessment, I will work for the project.

    4. Analytical module.

    5. Library of documents.

  1. Transfer of these commission documents necessary for the subsequent operation:

    1. "Description of the AIS "Project Management Portal"" (Passport of the system);

    2. "Instruction of the AIS PPU administrator";

    3. "Instruction for the coristuvach AIS PPU";

    4. “Program and methodology for testing AIS PPU”;

    5. "Test tasks for AIS PPU";

    6. “Role instruction that describes the procedure for working with AIS PPU as a tool for managing projects “International cooperation””.

  2. Commission decisions: software security last operation since 9 leaf fall 2011.

ADDITIONS:


  1. Protocol of forward trials No. 1

  2. Protocol of forward trials No. 2
Commission members:

V.M. Rudenko

S.V. Pushchakov

A.V. Matvenko

N.M. Kirsanova

A.I. Kulishov

O.V. Strakhova

Yu.M. Gudkov

E.R. Batarshin

Head office / Provid that cables

GOST 34.601-90

Group P87

INTERNATIONAL STANDARD

INFORMATION TECHNOLOGY

AUTOMATION SYSTEMS

STAGES OF CREATION

information technology. Set of standards for automated systems. automated systems. Stages of development

MKS 35.080
OKSTU 0034

Entered date 1992-01-01

INFORMATION DATA

1. DISCLAIMER AND INTRODUCED BY THE SRSR Sovereign Committee for Product Quality Control and Standards

2. APPROVALS AND INTRODUCTIONS BY THE DIA Decree of the Sovereign Committee of the SRSR on the management of the quality of products and standards of December 29, 1990 N 3469

3. VZAMIN GOST 24.601-86, GOST 24.602-86

4. REGULATORY AND TECHNICAL DOCUMENTS SUBMITTED

Item number, program

GOST 19.101-77

Addendum 1

GOST 34.201-89

Addendum 1

6*. REVIEW. Lipen 2009
________________
* Numbering follows the original. - Primitka of the bazi danich virobnik.

This standard is expanded on automated systems (AS), which are distinguished in different types of activities (continuation, design, management, etc.), including those that are created in organizations, associations and enterprises (further - organizations).

The standard establishes the stage of the AS creation.

In addendum 1, the dermal stage was tested.

1. TOP POSITIONS

1. TOP POSITIONS

1.1. The process of AS creation is a sequence of ordering at the hour, mutually related, united at the stage and that stage works, vykonannya which is necessary and sufficient for the creation of the AS, which is necessary for setting the vimog.

1.2. Stages and stages of AS creation are seen as part of the process of creation of rational planning and organization work, which ends with a given result.

1.3. Works for the development of the AS are carried out for the stages and stages that are necessary for the development of the AS.

1.4. The warehouse of that rule vikonannya robit at the stages established by the standard and at the stages they are assigned to the relevant documentation of organizations, as if they take part in the creation of specific types of AS.

The change of organizations, which the robots have created AS, is indicated in the addendum 2.

2. STAGES AND STAGES OF THE CREATION OF AS

2.1. Stages and stages of the development of the AU in the wild type are shown in the table.

Steps robot

1.1. Obstezhennya ob'єkta and obґruntuvannya necessities of the AS

1.2. Molding vimog koristuvacha up to AC

1.3. Issuing a letter about the vikonan work and an application for the distribution of the AS (tactical and technical department)

2. Development of the AC concept

2.1. Vyvchennya object

2.2. Carrying out the necessary scientific research work

2.3. Development of options for the AC concept and selection of the AC concept option

2.4. Designing a letter about the Vikonan robot

3. Technical task

3.1. Development and approval of the technical order for the NPP folding

4. Sketchy project

4.1. Development of the front design solutions for the system and її parts

4.2. Rozrobka documentation on the AU and її parts

5.1. Development of design solutions for the system and її parts

5.2. Rozrobka documentation on the AU and її parts

5.3. Development and execution of documentation for the supply of components for the assembly of nuclear power plants and (or) technical permits (technical orders) for their distribution

5.4. Razrobka zavdan on the design of the sum of the parts of the project of the automation object

6. Working documentation

6.1. Development of working documentation for the system and its parts

6.2. Development or adaptation of programs

7. Introduction to Diu

7.1. Preparation of the automation object before the introduction of the AS in the department

7.2. Staff training

7.3. Complete set of speakers that are supplied with vibrations (software and technical tools, software and hardware complexes, informational vibrations)

7.4. Budіvelno-assembly robots

7.6. Conducted anterior sampling

7.7. Carried out previous operation

7.8. Conducted initial trials

8. Support AS

8.1. Vikonannya robit vіdpovіdno to garantіyny goiter

8.2. Post-warranty service

2.2. Stages of that stage, which are consummated by organizations - participants in the work of creating AS, are established in contracts and technical specifications on the basis of this standard.

It is allowed to include the stage "Essay project" and other stages works at all stages, to combine the stages "Technical project" and "Working documentation" into one stage "Techno-working project". Depending on the specifics of the creation of the AS and the minds of their creation, it is allowed to complete the next stages of work until the completion of the previous stages, parallel to the completion of the completion of the stages of work, the inclusion of new stages of work.

ADDITION 1 (dovidkove). ZMIST ROBOT

ADDITION 1
Dovidkove

1. At stage 1.1 "Steeling the object and priming the necessary opening of the AS" at the head of the fall, carry out:

A selection of data about the object of automation and zdiisnyuvani vidi diyalnosti;

Evaluation of the quality of the functioning of the object and the zdіysnyuvanih types of activity, the manifestation of problems, the virіshennya of those that can be achieved by means of automation;

Assessment (technical-economical, socially poor) dotality of AS creation.

2. At stage 1.2 "Formation of the koristuvach to AC" carry out:

Preparation of output data for molding before the AS (characteristics of the automation object, description of the automation before the system, reduction of allowable weights for production, introduction into operation and operation, effect, which is to be checked in the system, understand the creation of that functioning of the system);

Formulyuvannya that formalization could koristuvach to AC.

3. At stage 1.3 "Issuing a letter about a vikonan robot and an application for the release of an AS (tactical and technical task)" to carry out a letter about a vikonan robot at this stage and completing an application for the release of an AS (tactical and technical task) or another document that replace. similar zmist.

4. At stages 2.1 "Vivchennya ob'єkta" and 2.2 "Conducting the necessary scientific and research work" organization-retailer to conduct a detailed study of the object of automation and the necessary scientific and research works (NDR), covering the way Realizations could koristuvach, draw up and confirm the announcements about the PDR.

5. At stage 2.3 "Development of options for the concept of AC and a choice of a variant of the concept of AS that pleases the koristuvach" at a wild stage, carry out the development of alternative options for the concept of AS and plans for their implementation; assessment of the necessary resources for their implementation and security of functioning; assessment of damage and nedolіkіv dermal variant; z_stavlennya vymog koristuvach that characteristics zaproponovanoї system and choice of the optimal option; assigned to the order of assessment of the strength and minds of the system; Evaluation of effects, how to measure the performance of the system.

6. At stage 2.4 "Issuing a letter about the vikonan robot", they prepare a letter to write a description of the vikonan robot at the stage, describing the obstruction of the proposed variant of the concept of the system.

7. At stage 3.1 "Research and approval of the technical order for the NPP closing" carry out the development, execution, weather and approval of the technical order for the NPP and, for the necessary, technical tasks for the part of the NPP.

8. At stage 4.1 "Development of the front design solutions for the system and its parts" the following is determined: the functions of the AU; subsystem functions, their goals and effects; warehouse complex zavdan and okremih zavdan; concepts information base, її enlarged structure; the functions of the system, which are kept by the data base; warehouse of the accounting system; functions and parameters of the main software features.

9. At stage 5.1 "Development of design solutions for the system and її parts" to ensure the development of critical solutions for the system and її parts, the functional-algorithmic structure of the system, for the functions of the personnel and organizational structure, for the structure of technical zastosovuvannymi mov, s organization and maintenance of the information base, systems of classification and coding of information, as well as software security.

10. At stages 4.2 and 5.2 "Research of documentation for the NPP and its parts" to carry out the development, execution, and approval of the documentation in the obyazі, necessary for a description of the totality of the adopted design decisions and sufficient for the false work of the NPP. See documents - according to GOST 34.201.

11. At stage 5.3 "Development and execution of documentation for the supply of components for the assembly of the AU and (or) technical permits (technical tasks) for their distribution" to carry out: preparation and execution of the documentation for the supply of components for the assembly of the AU; the designation of technical ones was able to put together technical specifications for the production of products, which are not produced in series.

12. At stage 5.4 "Designing the task for the design at the sum- mer parts of the project of the automation object," the development, registration, weather and approval of the task for the design at the sum- mit parts of the project of the automation object for carrying out everyday, electrical, technical, plumbing, robit, pov'yazanih z AU.

13. At Etapi 6.1 "The Robochokoy Documentary Documentary Parts system" Health is a rosobka of timid documentary, it is a mustache that are adequate to the Vikannnya Robit as the same, and such the system is valid until the accepted design decisions, її design, weather and hardening. See documents - according to GOST 34.201.

14. At stage 6.2 "Development or adaptation of programs", carry out the development of the programs of the system's software, selection, adaptation and (or) linking of the supplied software, development of the software documentation, according to GOST 19.101.

15. At stage 7.1 "Preparation of the automation object before the introduction of the AS in the department" to carry out the work of organizing the preparation of the automation object before the introduction of the AS in the department, including: the implementation of design solutions for the organizational structure of the AS; ensuring the management of instructive and methodological materials; Wikoristannya classifiers of information.

16. At stage 7.2 "Personnel training" conduct staff training and re-verification of the building and ensure the functioning of the AU.

17. At the stage "Assembly of AS components with components that are supplied" ensure the selection of components of serial and single components, materials and assembly components. Carry out input quality control.

18. At stage 7.4 "Business-assembly work" to carry out: vikonannya robіt z budіvnіtstva spetіalіzovannyh budіvel (accommodation) for the placement of technical aids and personnel of the AU; arranging cable channels; vikonannya works on the installation of technical equipment and line connections; testing the installation of technical equipment; delivery of technical support for carrying out start-up and maintenance work.

19. At stage 7.5 "Start-up work" to carry out autonomous adjustment of technical and software tools, data acquisition to the data base and re-verification of the system and management; complex improvement of all system benefits.

20. At step 7.6 "Performing anterior sampling" the following is required:

Testing of the AU for the practicality and reliability of the technical manager is viable before the program of the methodology of the previous testing;

Correction of faults and changes made to the documentation for the AU, including the exploitation is viable before the testing protocol;

Registration of the act on the acceptance of the AU from the final operation.

21. At stage 7.7 "Conducting the last operation" to carry out: the last operation of the NPP; analysis of the results of the last operation of the NPP; additional support (for consumption) of AS software; additional taxation (if necessary) of the technical requirements of the AU; execution of an act on the completion of the last operation

22. At step 7.8 "Conducting initial sampling" to carry out:

Testing for the viability of the technical manager is viable before the program of the methods of primary testing;

Analysis of the results of the testing of AS and the use of nedolіkіv, revealed during the testing;

Registration of an act on the acceptance of the AU for permanent operation.

23. At the stage 8.1 "The work is done until the warranty goiter" zdiyasnyuyut work from usunennya nedolіkіv, vyavlennyh pіd hour of operation of the AU protyazhnіh vstanovlenyh warranty terms, making the necessary changes to the documentation for the AU

24. At stage 8.2 "Post-warranty service" the following works are required:

Analysis of the system functioning;

Viyavlennyu v_dkhilen of the actual operational characteristics of the AU in the design values;

establishing the causes of cih vіdhilen;

Usunennya vyyavlenih nedolіkіv and zabezpechennya stability of operational characteristics of the AU;

Making the necessary changes to the documentation for the AU.

ADDITION 2 (dovidkove). PERELIK OF ORGANIZATIONS WHAT TO TAKE FROM ROBOTS

ADDITION 2
Dovidkove

1. Organization-deputy (koristuvach), for which the AU is created, that way it secures finance, takes care of that operation of the AU, and also vikonannja works from the creation of the AU;

2. The organization-retailer, as a zdіysnyuє zіysknyuє zі zі stvennja AU, representing the successor of scientific and technical services at various stages and stages of creation, as well as rozroblyayuchi and supplying various software and technical zasobi AU;

3. Postal organization, how it prepares the supply of software and technical support for the purchase of a retailer or a deputy;

4. Organization-general designer of the automation object;

5. Organizations-designers of various parts of the project of the automation object for carrying out everyday, electrical, sanitary and other training work, related to the AU's creations;

6. Organization of life, installation, taxation and others.

Notes:

1. The creation of the AS by the minds of the minds can be varied in the functions of the deputy, the retailer, the postal worker and other organizations, which the robots have the creation of the AS.

2. The stages and stages of their work from the creation of the AU are determined on the basis of the standard.

Electronic text document
preparations AT "Kodeks" and zvіreny for:
official appearance
M: Standartinform, 2009

What is in principle needed in the design?

Go out in such a way that DSTU helps the designer himself.

The main problem of the design time is the cost of the design itself. Є deyakі urivki dumok, bazhan, ale molding їх at yakus tіlіsnu picture. Tse authorities and system administrators-pochatkivtsyam and system engineers-pochatkivtsyam. Є pevna spontaneity of thought. Before the speech, there is powerful and wealthy deputy. Ale stinks perebuvayut at the greater vigilant camp, lower vikonavtsi.

Blame the cicavia: and who needs all the explanation notes, TK just? І os yak tsіkava vіdpovіd vyide: 85% of the documentation is necessary for vikonavtsiu. 15%, which is lost, will be needed by the deputy for some kind of infamous understanding of what is expected. Ale vikonavtsyu is required to be clearly identified as between the project, and the signs of yogo vikonnannya. The vikonovets is guilty of being able to protect himself in the face of the chaotic thought of the deputy.

Otzhe, zvernemosya to GOSTіv rozrobnik. We have two main ones: GOST 34 series and GOST 19 series. The 34th series is due to the development of automated systems, and the 19th - to the development of software.
We are talking about GOST 34th series.

The 34th series has a lot of different GOSTs. We are less likely to be deceived by them. And to herself:

1. GOST 34.003–90 Information technology. A set of standards for automated systems. terms and definitions
2. GOST 34.601–90 Information technology. A set of standards for automated systems. Automated systems. Stages of creation
3. GOST 34.602–89 Information technology. A set of standards for automated systems. Technical design of the automated system
4. GOST 34.603–92 Information technology. See the testing of automated systems
5. GOST 34.201–89 Information technology. A set of standards for automated systems. You see, the completeness and recognition of documents when building automated systems
6. RD 50-34.698-90. Automated systems. Please help me to change the documents.

DSTU is similar in its hierarchical structure to the catalog. On such, for example, yak Active Directory. Imovirno, if you write documentation strictly following the GOSTs, then cross-sell to allow you to familiarize yourself with the great number of documents. Ale scho naygolovnіshe in GOSTs, tse reading model vіd zagalnogo to private. Starting from the wildest phrases, we went to the rest of the RJ45 in the system.

And now the report. The main GOST, for example, some kind of so-called. dance є GOST 34.601-90 (Stage of creation). Let's take a closer look at the document.

The axis of such a structure is familiar to us in this document. What is so miraculous? Miraculous in tsimu those scho mi bachimo practically povny cycle of life of an automated system. Why mayzhe? That is why there is such a stage here, as a result of exploitation and utilization. Ale, we don’t need anything. For the time being, there is too much to go through and the basic stages. Tim more that the stage of utilization is considered in one of the other GOSTs, but it is not necessary to go beyond the scope of this article.

As I said above, the guests will avenge cross-sufficiency. І schob pіti dali in our mіrkuvannyah, mi troch zazirnemo to GOST 34.003-90 (terms and designation). At the new one, the designation of the automated system. Tse is important, because we still need a mother to appear, what are we going to do.

GOST 34.003-90 for the designated automated system seems to us the following: the system is automated; AS: The system that is put together with the staff and the complex of automation of activities, which implements information technology and implements the installed functions. Tobto. In other words, AC is composed of

1. Staff
2. complex of cats
3. Singing activity that drives automation.

Also check with GOST 34.003-90

1. a set of tools for automating an automated system; KSA AS: The collection of all AS components, the number of people
2. Koristuvach automated system; koristuvach AC: A person who takes part in the functioning of the AU or wins the results of the functioning
3. operating personnel of the automated system; plant operating personnel
4. component of an automated system; component AC: Part of the AC, seen behind a single sign, or by the combination of a sign and seen as a single whole

What do we have to go out? And to go out, scho mi vіdchuli under the feet of the singing foundation, on a kind of spirituality. We know why the automated system is being built and clarified that the staff is of two types: corystuvalnic and operational. And it is logically visible that the component of the AS, visions behind the singing sign, will be t.s. "hardware" and "software" are as simple as that. І sukupnіst program + zalіzo bude complex zasob_v avtomatizatsії AU.

So, as a substitute, for example, if you say “And install me Exchange”, then there will be no AS for one simple reason: at least such a task has no kind of activity that automates. And maybe the deputy will not need Exchange. And maybe you do not need Exchange. And tse means that the automation object is required. And that means that the first stage of GOST 34.601-90 (Stage of creation) begins. "Formuvannya vymog up to AC"

At this stage, DERZHSTANDART helped us to develop a sprinkling of stages. If you translate it with human mine, then here it’s my fault to signify what you need to start rozroblelyat. Chi tse dotsіlno raznih point of dawn. Zagalom to assess the need for the cob robit. Under the bag of work at this stage, it starts to sound, which fixes the result.

In addition, as we have agreed with the deputy, that we have enough ideas for development, we can move on to the next stage of “Exploration of the AC concept”.

At the conception it is necessary to learn the object, it is necessary to make the choice. As at the first stage, we were joking about the reason for the creation of the AS in the fire (they were less likely to be business purposes, just GOST was written the same way, if such words were not lived), then at the other stage we need to know the possible options, as they please the assistant of the deputy. For example, like a deputy want postal system, then you can implement both on Exchange, and on Postfix, or why not. With its pluses, minuses and development options. A thorough examination of the object is carried out and labor costs are assessed in advance. Mi, like vikonavtsі, tezh shukaєmo for yourself the best option.
In addition, as we come from the deputy to the song of a single thought about those, which is the most variant of the solution for you to go as far as possible, we move on to, not afraid of that word, the most important item in the project "Technical Engineering"

The technical task, which is to admire the designation of GOST 34.602-89, is the main document that determines the order of the order (development of the modernization and distance of the order) of the automated system, it is necessary to carry out the design of the AS and the reception at the start of the day.

The TK of the flooring is an important document that a personal GOST is assigned to you. At the same time, we won’t be reporting on whom. I would like to remind you that for the correct molding of the TK it is necessary that the stage of GOST 34.601-90 "Formulation could be up to AC" and "Development of the concept of AC" was completed. Vіd yakostі vykonannya tsikh stаdіy to lay down the correctness and correctness of the creation of TK.

Entry date from 07/01/1987

This standard is being expanded on automated systems (AS), which are victorious in different types activities (continuance, design, management), including their subdivisions (continuance - design - management, design - management) that are created in organizations, associations and enterprises (hereinafter - organizations).

The standard establishes the stage of development and development of AS and the main results of the work on the skin stage.

The standard does not vary by the order of distribution of component parts that are vicorated in the AU.

The procedure for the development of complexes of automation tools, technical tools, software tools, etc. is subject to the standards of the distribution system and the supply of products and equipment for production, which are in the hands of the deputy head of the AU.

At the doc, the addendum provided an explanation of that deaky term, which should be included in the standard.

1. TOP POSITIONS

1.1. The creation (development) of the AS is the ordering ordering at the hour, mutually connected, united at the stage and that stage is working, vykonannya which is necessary and sufficient for the creation of the AS, which is necessary for the tasks.

1.2. Warehouse, zmіst and order vikonannya robit at the established tsim standard stages and etapah vynachayut in normative and technical documentation schodo creation of the AU in a vidpovidny mind.

2. STAGES AND STAGES OF THE CREATION OF AUTOMATION SYSTEMS

2.1. The stages of this stage are robbed in the tables.

StagesSteps robot
1. Follow-up and priming of the AS 1.1. Obstezhennia (selection and analysis of data) of an automated object, including the selection of information about foreign and domestic analogues
1.2. The development of that design was able to reach the system (technical and economic priming, tactical and technical planning, application)
2. Technical task 2.1. Scientific research work*
2.2. Development of the preliminary project
2.3. Development of the technical task at the AU with a call and, for the need, private TK at the subsystem of the AU
3. Sketchy project 3.1. Development of the front solutions for the selected option AC and other types of security
4. Technical project 4.1. Exploration of residual solutions from the systemic nutrition, including some AS structures (functional, organizational); procedures (zavdannyam) that are implemented by the system; to the process of functioning of the system, if necessary, taking into account private technical tasks for the distribution of views on the security of the AU or on the security of the subsystem of the AU
4.2. Development of solutions for organizational security, including the development of the plan of entry and preparation for the implementation of the AU
4.3. Development of solutions for technical security
4.4. Development or selection of algorithms in activities that are automated
4.5. Development of solutions for information security
4.6. Development of solutions for linguistic security
4.7. Development of solutions for software security
4.8. Development of solutions for methodical security
4.9. Development of design and construction documentation
4.10. Uzgodzhennya solution for zv'yazkіv vidіv vzbezpechennya between themselves and the distribution of systemic documentation for the NPP as a whole
4.11. Folding of pre-made documentation for the components that are supplied, and complexes of automation tools or technical specifications for their distribution
5. Working documentation 5.1. Distribution of work documentation from information security
5.2. Distribution of work documentation for organizational security
5.3. Development of work documentation with methodical security
5.4. Development of work documentation for linguistic security
5.5. Development or adaptation of software and software documentation
5.6. Development of documentation for the technical documentation of one-time preparation
5.7. Development of design and construction documentation
6. Preparation of non-serial components in the complex of automation tools (KSA) 6.1. Preparation of KSA components
6.2. Autonomous adjustment and testing of KSA components
7. Introduction to Diu 7.1. Preparing the organization before the introduction of the AS in the department, training the staff of the coristuvach *
7.2. Budіvelno-assembling robots *
7.3. Complete set of speakers * with complexes of automation tools, technical tools, software tools, etc.
7.4. Start-up and adjustment robots * (complex adjustment of KSA)
7.5. Carrying out the last operation of the AU
7.6. Carrying out primary trials
7.7. Usunennya respect, revealed pіd hour viprobuvan AU
7.8. Acquisition of the AS from the industrial operation (providing the AS)

* Stages are allowed to be victorious at the earlier stages, depending on specific minds of development.

2.2. Warehouse, sequence and terms of the implementation of the stages and stages of work, which are fixed during the folding (development) of the AS, are installed at the technical plant for the creation (development) of the system from the number of stages and stages, pointing at the table.

2.3. The zastosuvannya introduced into the power plant on similar objects is being developed by a way of choosing ready-made design solutions for a disassembled system and components (complexes of automation tools, software tools, technical tools, etc.)

Decisions about the possibility of testing the AS accept a commission for the hour of the initial testing of the system.

2.4. Under the hour of the creation (development) of the AS with the obov'yazkovymi stages є: "Technical design", "Technical project", "Working documentation" and "Water at the house".

For simple systems, those systems that are developed from different standard design solutions combine the stages of "Technical design" and "Working documentation" into one.

2.5. Obov'yazykovami etapami pіd hour of the AS є: 1.2; 2.3; 4.1-4.5; 4.7; 4.9 - 4.11; 5.1; 5.2; 5.5; 7.1; 7.3 - 7.5; 7.6 and 7.8.

2.6. It is allowed to carry out scientifically advanced work (stage 2.1) at the stage of “Continuing and substantiating the creation of the AS”, and, if necessary, at other stages.

3. RESULTS OF THE VICONANNY ROBOT IN STAGES

3.1. The result of the completion of the stage “After completion and registration of the AS” is a scientific and technical sound, tactical and technical task, technical and economic evaluation, or an application for the registration of the AS.

3.2. The result of the completion of the stage "Technical design" is the technical task of the creation of the AS.

3.3. The result of the completion of the stage "Esk_zniy project" is an ekz_zny project.

3.4. The result of the work at the stage of "Technical project" is a technical project.

3.5. The result of the work at the stage "Working documentation" is a set of working documentation AS.

3.6. As a result of the work at the stage "Preparation of non-serial components of the KSA" - the components of the KSA, which passed the testing in the prescribed manner.

3.7. The result of vikonannya robit at the stage of "Introduction to business" - the adoption of the AU from the industrial exploitation.

3.9. The development (modernization) of the operation of the system depends on the decisions taken on the basis of the results of the analysis of the operation.

ADDITION

Dovidkove

TERMS WHICH ARE VICTORATED IN THE STANDARD, THESE EXPLANATIONS

termExplanation
Automated system The system is stolen in mutual pytrzdrzdiliv organized (Abo Kolektiv Specialalist).
Complete sets in AS Part of the AU, which is supplied, is a component or mutually related to the totality of components (complex) of one or more types of safety, broken down to the most important regulatory and technical documents, which passed the state, interstate, or in the preparation, selection of samples confirmed in established order technology, adopted by the service of technical control (standard control) of the organization of the virobnik (postal worker). Completing AS products for products of general and technical recognition
Methodical security of the AU Documents that should be considered in conjunction with a complex of automation tools, including a description of the system and subsystems, a methodology (technology) for the implementation of automated activity, instructions for coristuvachiv
Organizational security of AS Documents (regulations, planting instructions, staffing layouts, qualifications, etc.), which establish an organizational structure, functions and order in mutual relations with each other during the operation of the AU, including instructions for personnel
AC component An element of one of the types of security (technical, software, information, etc.)

The process of AS creation is a sequence of ordering at the hour, mutually related, united at the stage and that stage works, vykonannya which is necessary and sufficient for the creation of the AS, which is necessary for setting the vimog.

Stages and stages of AS creation are seen as part of the process of creation of rational planning and organization work, which ends with a given result.

Works for the development of the AS are carried out for the stages and stages that are necessary for the development of the AS.

The warehouse of that rule vikonannya robit at the stages established by the standard and at the stages they are assigned to the relevant documentation of organizations, as if they take part in the creation of specific types of AS.

Stages and Stages of work

1. Molding up to AC

1.1. Obstezhennya ob'єkta and obґruntuvannya necessities of creation of the AU.

1.2. Forming vymog koristuvach to AC.

1.3. Issuing a letter about the vikonan work and an application for the distribution of the AS (tactical and technical department)

2. Development of the AS concept.

2.1. Vyvchennya object.

2.2. Carrying out the necessary scientific research work.

2.3. Development of options in the concept of the AU, which will help the koristuvach.

2.4. Designed a letter about the Vikonan robot.

3. Technical task.

Rozrobka that zatverdzhennya tekhnіchnogo zavdannya on AU.

4. Sketchy project.

4.1. Development of the front design decisions behind the system and its parts.

4.2. Rozrobka dokumentatsії on the AU and її parts.

5. Technical project.

5.1. Development of design solutions for the system and its parts.

5.2. Rozrobka dokumentatsії on the AU and її parts.

5.3. Development and execution of documentation for the supply of components for completing the AU and (or) technical support (technical orders) for their distribution.

5.4. Razrobka zavdan on the design of the summіzhnyh parts of the project of the object of automation.

6. Working documentation.

6.1. Development of working documentation for the system and its parts.

6.2. Rozrobka chi adaptation program.

7. Introduction to the diyu.

7.1. Preparing the object of automation before the introduction of the AS in the department.

7.2. Staff training

7.3. The complete set of speakers, which are supplied with vibrations (software and technical tools, software and hardware complexes, informational vibrations).

7.4. Budіvelno-assembling robots.

7.5. Start-up and maintenance robots.

7.6. Conducted anterior sampling.

7.7. Carried out verified operation.

7.8. Carrying out priymalnyh viprobuvannya.

8. Support AS

8.1. Vikonannya robit vіdpovіdno to garantіynih goiter'yazan.

8.2. After-sales service.

GOST 34.602-89 "Technical design of the automated system"

1. TOP POSITIONS

1.1. TK on the AU is the main document that defines the order of folding (development or modernization - further folding) of an automated system, it is necessary to carry out the development of the AU and її priymannya pіd h v dіyu.

1.2. TK on the AU is divided into the system as a whole, recognized for work independently or in the warehouse of another system.

1.3. Vmogi up to the AU in the obsyazі, established by this standard, can be included in the task for the design of the automation object that is being created. І here TK on the AU is not rozroblyayut.

1.4. Vimogi, which are switched on up to TK at the AU, are due to the modern level of the development of science and technology and do not compromise with analogous vimogi, which are up to the shortest modern vacancies and foreign analogues. Wimogi, which are specified in the TOR for the AU, are not guilty of interfering with the retailer of the system in search of the implementation of the most effective technical, technical and economic and other solutions.

1.5. TK on the AU is expanded on the basis of output data from that number, which is carried out at the sub-package documentation of the stage “After-sales and installation of the AU”, inserted by GOST 24.601.

1.6. In TK on the AU, turn on the power, yak add the power to the systems of this type (ACS, CAD, ASNI, then. Bud.), Like the working NTD, and are determined by the specifics of the particular object that the system is created.

1.7. Change to TK at the AU draw up additional or signed by the deputy and the retailer with a protocol. Additional protocol assignments are an invisible part of the TK on the AU. On the title page of the TK on the AC, there is a note "Dіє z ...".

2. WAREHOUSE I ZMIST

2.1. TK on the AU should be divided in such a way, so that they can be added to the following:

2) recognition and purpose of the creation (development) of the system;

3) characteristics of automation objects;

4) vimogi to the system;

5) warehouse and utrimannya robit from the system;

6) procedure for control and acceptance of the system;

7) help to the warehouse and work for the preparation of the automation object before the introduction of the system at the office;

8) help before documentation;

9) dzherela rozrobki.

At TK on the AU, add-ons can be turned on.

GOST 34.603-92 "See the test"

1. TOP POSITIONS

1.1. Testing of the AU is carried out at the stage of "Introduction to the practice" according to GOST 34.601 with the method of re-verification of the AU's validity, which is done in the light of the technical task (TK).

1.2. The testing of AS is a process of re-verification of the given functions of the system, delineation and re-verification of the viability of the technical specifications of the kilkish and (or) the lesser characteristics of the system, revealing that the shortcomings in the system, in the development of documentation.

1.3. For speakers, the following main types of testing are installed:

a) in front;

1) autonomous;

2) complex.

b) last operation;

The final operation should be carried out in accordance with the program, in which order:

1) understand the order of functioning of parts of the AU and the AU as a whole;

2) the validity of the previous operation, sufficient for re-verification of the correct functioning of the AU in the case of impaired skin function of the system and the readiness of the personnel to work in the minds of the functioning of the AU;

3) the procedure for the adoption of nedolіkіv, revealed in the process of subsequent operation.

c) accepting.

Primary sampling should be carried out in accordance with the program, in order to indicate:

1) a copy of the objects seen by the system for testing that change could, as a result of the object’s confirmation (from the request to the points of TK);

2) criteria for accepting the system and її parts;

3) understand the terms of the trial;

4) Koshti shodo viprobuvan;

5) awards osib, vydpovidalnyh for carrying out sampling;

6) the method of testing and processing of their results;

7) retransmission of completed documentation.

http://www.franklin-grant.ru/ru/technologies/gost.asp


Features of NUO. Characteristics of the objects of keruvannya.

The structure of the NUO. Rivnі i sistem nravіnnya NUO.

Features of VT in NDO:

1) Territorial division of the objects of the NUO, VT and AS.

2) Uninterrupted and discretely uninterrupted nature of technological processes.

3) Foldable climatic mind and exploitation of that temple is fire-friendly.

4) Low-skilled service personnel.

5) Accomplishment of galuzi є mysto-forming.

The scheme of interconnection of technological complexes of NEO was enlarged:

Etapi rozvitku. Sequence of metasystem transitions:

70 rr. – centralized systems for collecting and processing information on the basis of EC-EOM: KIVC\RIVC.

80 rr. – microprocessor technology, new technologies (decentralized) are being launched: CM-EOM, TECHNIK, MicroDat.

90 rr. – cluster system, without any autonomous subsystems: PEOM.

2000 – client-server technologies, piece intelligence technologies, out-of-the-box technical solutions.

Nini NUO on a high level of development.

Firm concepts and solutions for the automation of the IUO:

1) ERP (Enterprise Resource Planning) - automated control system, AS management of business resources.

2) EAM (Enterprise Asset Management) - AC management of labor costs and funds.

3) MES (Manufacturing Execution System) - automatic control system, systems for operational management of manufacturing.

4) SCADA - process control system, AS control of technological processes.

PLC - program logic controllers.

DCS - rozpodіleni systems keruvannya.

The AS is implemented in a visual sequence of information related functions, tasks or procedures that are displayed in an automated (interactive) or automatic mode

Automated technological complexes- a set of technological and software tools necessary for the singing type of production and production processes.

4) development of optimal technological regimes;

5) distribution of the necessary material resources and their optimal distribution - possession;

6) link to the maximum balance and analysis of pet vitrates;

7) analysis of downtime of technological possession and appearance of costs;

8) automated processing of results and technological information;

9) management of technical services and repair of technological equipment.

On the upper level, the task of directing to the support was adopted by the facsimiles in the minds of the work and business that change.

The decision to accept the decision for the undertaking (Middle day) was straight forward.

Functional on equal shop floor:

1) collection of information by automation systems of technological objects;

2) creation and maintenance of the database;

3) formation and transmission of information on the equal footing of business;

4) control of the setting of technological regimes;

5) operational analysis of the efficiency of entry;

6) diagnostics of robotic technological possession and technical aids of automation;

7) keeping of known and planning documents.

The vision of these tasks is directed at the implementation of the adopted decisions in the minds of the robots and workshops of the enterprise that are being changed.

Vimogi to the ACS on the different levels of the NUO. (baby)


Riven technological object:

(Lower rіven)

1) selection of information from sensors and automation systems according to the regulations;

2) automatically update and save primary information;

3) automatic keruvannya that regulation of technical objects (zavdannya statutes);

4) dialogue with the operator-technologist;

5) safety control of safety parameters.

The main principles of encouraging the AU on different levels of business:

1) Invariance of functions on the dermal level of control according to the number and types of technological objects: the system should be tuned to a specific object of recognition and additional new f-mi. Tree of types of objects => Tree of concrete objects.

2) Intellectualization of the quiet and programs of the middle-in-the-way automation of the f-th personnel.

3) Standardization, the summіsnіst devices and programs are guaranteed as a result of lowering the cost of their operation.

4) The architecture of the complex is responsible for ensuring the implementation of various configurations of directing systems with radial, circular and zmіshanim communication channels, incl. via wired radio channel.

See the security of the AU. Problems, Models and Problems of Integration of ACS to NDA

In the field of automated systems, there are software and technical complexes (PTK), software and methodological complexes (PMC) and components of tech. Software and information security.

AS - a collection of mutually supportive components and complexes of software, technical and informational security, which are expanded, which are prepared and delivered as products of general and technical designation. Spіlne funktsionuvannya and vzaєmodіya kompleksіv skladє osnovі oschilyuvalnyh merezh.

ПЗ АС - the sequence of programs on the basis of information with program documentation according to GOST 19.101.

Technical securityАС - the order of the responsibilities for the implementation of the managing input, the responsibilities for the withdrawal, introduction, preparation, reworking, processing, saving the registration, visualization, reconciliation and transfer of data from the design documentation according to GOST 2.102 and operational documentation.602.

INFORMATSINA Objected AS-the pungent of systemic-native dannia, Sho of the dereniyati at the System of Dictionary Basovikh (classifikatori, Typovi Modeli, Elemyph Automatia, Format of Documentary) stages of the life cycle.

Organizational and methodological security of the AS - the collection of documents that define the organizational structure of the object and the automation system, the activity in the minds of the system functioning, the form of the presentation of the results in the activity.

Mathematical security of the AS - a combination of mathematical methods of models and algorithms for processing information that are victorious in the functioning of the system.

Linguistic security - the collection of current assets to encourage and improve informational units of the KSA.

Acceptance act for the last operation is formed according to the results of the previous testing and includes: vysnovki zroblenі for the results of complex testing; order for the last operation.

Time period of work commission

At this division of the act of acceptance, it is necessary to give the cob and the completion of the work of the preliminary commission from the carrying out of the preliminary testing.

The cob of the conducted sampling - 01 leaf fall 2010r.
Completion of the testing - 31 December 2010.
The total duration of the testing is 44 working days.

Name of the organization-deputy, organization-viconavtsa and organization-spivvikonavtsa

The name of the organization of the participants in the conducted testing and how they put the act of taking the information system into operation.

Organization-deputy - VAT "Deputy".
Organization-vikonavets - CJSC "Vikonavets".
Organization-spivvikonavets - TOV "Co-executor" (yakscho є).

Warehouse of AIS functions, which are accepted for final operation

The warehouse of AIC functions is being refurbished, which are accepted for the next operation. Functions can be transferred as a global system, and through subsystems. Functions are taken from the section "Vymogi to functions that are considered by the system" of the technical task of creating an information system.

Change of warehouse technical, software, informational and organizational security, which are changed in the process of last operation

At each division of the act of acceptance, a re-testing should be carried out, which will be carried out for the next hour of the last operation. Perelik testing is taken from the distribution "Obsyag testing" by the testing program.

The process of final operation requires testing, presented in the tables below.

Transfer of documents, which are submitted to commissions

At the distribution of the act of acceptance, a transfer of these commission documents for the necessary performance of the final operation is to be made.

Instructions for the formation and maintenance of data base (set of data), version 1, dated 12.09.2010.
- Posіbnik koristuvach, version 1 vіd 09/14/2010.
- ...

Evaluation of the quality of the technical task, which is accepted by AIS

An assessment is made of the reliability of the technical task that AIC is accepted.

For the results of the previous tests, the System verifies the results, we will submit the document: "". Version 1.0.

Main results of acceptance into the last operation

At the distribution of the act of acceptance, the main results of the award are repaid for the results of the subsequent operation of the information system.

Based on the results of the last operation, the following main results may be taken away:
- The system is practical;
- Subsystems of the System - vzaєmodіyut;
– the system of compliance with the requirements of the document “Technical requirements for the creation of an automated system”. Version 1.0;
- All characteristics of the assessment, which are used, are within acceptable limits.

Resolution of the commission on the acceptance of AIS for the last operation

A decision is made on the commission about the possibility of accepting the information system for the next operation.

Kovtun M.V. Zhovten 2010 rock.

Decree to the Order of the Russian Federation dated June 6, 2015 No. 676
"About the help to the order of creation, development, commissioning, exploitation and maintenance of the sovereign information systems that far-fetched collection of information that is hidden in their data bases"

Vіdpovіdno up to part 6 of Article 14 of the Federal Law "On information, information technologies and about the protection of information "The order of the Russian Federation praised:

1. Approve the rules up to the order of creation, development, commissioning, operation and development of state information systems and further collection of information that is stored in their databases.

2. Install, when you come in, forwarded by the authorities, approved by the decree, established by the federal bodies of power within the boundaries of budget allocations, transferred by the federal law on the federal budget for the annual financial period and the planning period for the maintenance and management of the established functions.

3. Recommend to the sovereign bodies, the KRIM of the federal organized viconavchcho viconavchcho, the Russian Federal Federal Administrative Offenses, I have the authorities of the Holds, the authorities of the MST -URIVADYAVANY, the authorities of the MST -Vimovas, the organs of their own vimyalos, inquisitive.

Wimogi
to the order of creation, development, commissioning, operation and removal from the operation of sovereign information systems and further collection of information that is stored in their data bases
(approved by the resolution of the RF Council on 6 April 2015 N 676)

With changes and additions like:

I. Gale positions

1. The document of VIMOGI VIMOGI to the order of realization of the VADIV SHODOVENNE, ROZVITA, introduced in the EXTRACTASIA, EXCLETASITAS TO VISPENSIA STRICHIC SYSTARIS (DALI - system) of the vicious vico, which is federal, pusha та органами виконавчої влади суб'єктів Російської Федерації (далі - органи виконавчої влади) з метою підвищення ефективності реалізації повноважень органів виконавчої влади в результаті використання інформаційно-комунікаційних технологій або органами виконавчої влади, що виступають як публічні партнери, та приватними партнерами відповідно до угод про state-private partnership (Dali - private partner) with the method of realization of designated interests.

1.1. In the implementation by the authorities of vikonavcho, either by private partners, they enter into the creation, development, commissioning, operation and maintenance of systems and the further collection of information that is stored in their databases, due to:

a) in addition to the protection of information that is to be avenged in the systems that are established by the federal body of vikonavchoi power in the sphere of security and security of the federal body of vikonavchoi power, we will support the Galuzi against technical research and technical protection of information in the interim;

b) help to organize and enter the defense of information that is avenged in the system;

Information about changes:

Clause 1.1 was supplemented by subclause "c" on April 27, 2019. - Decree

c) in addition to protecting personal data, transferring part 3 of Article 19 of the Federal Law "On Personal Data" (in terms of visibility in the system of personal data).

Information about changes:

Resolution of the Order of the Russian Federation dated January 11, 2017 N 555 Vimogi amended by paragraph 1.2

1.2. With the help of the method of vikonnannya, it was possible to defend the information, which was passed by clause 1.1 of the document (hereinafter - in order to protect the information), the authorities of vikonavchos vlady appoint vimogi to the suppression of information, which is to be revenged in the system, to the authority of vikonavchos vlady, for which purpose:

a) the appointment of information that protects against illegal access, denigration, modification, blocking, copying, copying, distribution, as well as other illegal and other such information;

b) analysis of normative legal acts, methodological documents and national standards, which may confirm the system;

c) classifying the system in a way that can protect information;

d) designation of threats to information security, the implementation of which can lead to the destruction of security of information in the system, and the development on the basis of the model of threats to security of information;

e) could be assigned to the information system (subsystem) to defend information that is avenged from the system.

II. Wimogi before the order of the system

2. Substantiating before the system is closed:

a) obliging the body of the vykonavcho ї to control the creation of the system, the transfer of normative legal acts;

b) the decision to the body of the vikonavcho about the creation of the system with the method of ensuring the implementation of the provisions of it again;

Information about changes:

Paragraph 2 was supplemented by subparagraph "c" on April 27, 2019. - Resolution of the Council of Ukraine on April 11, 2019 N 420

c) decision of the Council of the Russian Federation regarding the implementation of the state-private partnership project;

Information about changes:

Paragraph 2 was supplemented by subparagraph "d" on April 27, 2019. - Resolution of the Council of Ukraine on April 11, 2019 N 420

r) the rizhennya of the Vicheogo Viconavicho to the structure of the holding of the North North Po'iyska federal, the Yakshcho Gromadsky partner є submarit federal federal federal competition was held by the Submeri federal federal competition (KRIM Vipadkiv was held in the post of federal competition.

3. The fraud of the system is healthy to the techic to the technology department to the urahuvanni models of the rhinomas іnformasi, navigated with the pidpunct "g" Pop 1.2 of the TSEO, and the same is the same .

Model of a giga of a lack of reformist (Abo) Technician Zavdannya to the stimulus of the systems of the system of vicony of Viconavichcho viconavichi, the federal body of the Viconavchcho, which is inherent in the sphere of tech, they were able to protect the information.

The technical task of setting up the system can be included in the form, in accordance with subparagraphs "a" and "c" of clause 1.1 of the first document, in order to protect the information that is to be cleared in the system.

4. The technical task for the creation of a system of threats to the security of information is confirmed by the landowner to the authority of the vikonavchoi government, and the necessary changes are laid on the yak.

5. The order of the system's creation includes the following stages, which are subsequently implemented:

a) development of documentation for the system and its parts;

b) development of working documentation for the system and its parts;

c) development and adaptation of software;

d) start-up and maintenance robots;

e) carrying out forward testing of the system;

e) carrying out the final operation of the system;

g) carrying out primary testing of the system.

6. The stage of development of documentation for the system and part of it, including the development, pogodzhennya and ratification of documentation in the contract, necessary for the description of the totality of the design solutions (including the protection of information) and sufficient for further development of the system.

7. ETAP ROSBRICS OF THE Documentary Documentary on the system of this part is the rod, the pasto -lechder of the Documentary, ShO MISTOMI VIDOOMOSTI, NEKHIDNI for Viconnya Robit of the systems in the Extraitic system, the order adjustments of the level of operational characteristics (capacity) of the system (including including the protection of information), established in the design decisions, assigned to clause 6 of the document, including:

a) a change in the performance of the work of the system, including the change, see, and the periodicity of the operation of the system;

b) control of the practicality of the system and components, which ensure the protection of information;

c) a list of faults that can be blamed in the process of operating the system, those recommendations can be used in different situations;

d) transfer of modes of the robotic system and their characteristics, as well as the order of the rules for transferring the system from one mode of operation to the next of the designated ones necessary for that hour.

8. The stage of development or adaptation of the software includes the development of the system software, selection and adaptation of the custom software, as well as installed infalls the order of certification of the distributed software security of the system and the protection of information for the security of information.

9. The stage of start-up and maintenance work, including autonomous adjustment of technical and software security of parts of the system, the acquisition of information in the data base, complex adjustment of technical and software security of the system, including the protection of information.

10. The stage of carrying out the previous tests includes:

a) razroblennya software and methods of previous testing, depending on what needs to be re-verified the system for practicality and compliance with the technical task for the її creation;

b) re-verification of the system for practicality and compliance with the technical task for the її creation;

c) the adoption of the findings during such testing of faults and the introduction of changes to the documentation and operational documentation for the system;

d) execution of the protocol for testing the act on the acceptance of the system for final operation.

11. The stage of the final operation includes:

a) development of the program and methods of subsequent operation;

b) the final operation of the system is valid until the program and methodology of the final operation;

c) additional software security of the system and additional improvement of technical benefits in case of revealing shortcomings, revealing the last hour of the last operation of the system;

d) execution of an act on the completion of the last operation, which includes a transfer of nedolіkіv, as it is necessary to put on the cob the operation of the system.

12. The stage of carrying out initial trials includes:

a) testing of the system for compliance with the technical manager on the basis of verification prior to the program of the methodology for initial testing;

b) analysis of the results of the adoption of shortfalls, assigned to the act on the completion of the last operation;

c) execution of an act on the acceptance of the system into operation.

III. Wimogi until the system is put into operation

13. Submitting for the introduction of the system into operation is a legal act to the authority of the government on the introduction of the system into operation, which determines the transition to how to ensure the commissioning of the system into operation and put the lines on the top of the operation.

14. Legal act to the authority of the vikonavchoi government about the introduction of the system into operation, including:

a) go in and check out those approved organizational and ordering documents that signify go in and get information in the course of the operation of the system, the development of which is transferred by regulatory legal acts and methodological documents federal agency vikonavchoi government in the sphere of security and safety of the federal body of vikonavchoi government, approved in the sphere of anti-technical research and technical protection of information, as well as national standards in the sphere of protection of information;

б) заходи щодо атестації системи за вимогами захисту інформації, внаслідок яких у встановлених законодавством Російської Федерації випадках підтверджується відповідність захисту інформації, що міститься в системі, вимогам, передбаченим законодавством Російської Федерації про інформацію, інформаційні технології та захист інформації;

c) go in to prepare the body of the vykonavchoї vlady, as well as a private partner at the time of laying down about state-private partnership before the operation of the system;

d) go to the preparation of the landowner's tax authorities to the authority of the government, as well as the practitioners of the private partner at the time of laying down the state-private partnership before the operation of the system, including the taxpayers for the security of the protection of information.

15. Putting the system into operation is not allowed in the following situations:

a) non-compliance established by the legislation of the Russian Federation could be free of information, including the validity of a ceremonial certificate of certitude for the security of information;

б) відсутність у реєстрі територіального розміщення об'єктів контролю, передбаченому Правилами здійснення контролю за розміщенням технічних засобів інформаційних систем, що використовуються державними органами, органами місцевого самоврядування, державними та муніципальними унітарними підприємствами, державними та муніципальними установами, на території Російської Федерації, затвердженими постановою Order of the Russian Federation on April 6, 2015 N 675 "On the order of health, control over the Dotrimanni of the Vimog, the rowing of part 2.1 Statti 13 of the same part 6 statts 14 of the Federal Law" On the INformation, INformation Technologies that Zachist Informatics ", Vidomosti about the roseman of the technology of the federal systems for the Teritarian systems for the Teriral of

в) невиконання вимог цього розділу, виявлених у ході здійснення контролю відповідно до Правил здійснення контролю за дотриманням вимог до порядку створення, розвитку, введення в експлуатацію, експлуатації та виведення з експлуатації державних інформаційних систем та подальшого зберігання інформації, що міститься в їх базах даних, approved by the resolution of the Order of the Russian Federation on April 6, 2015. N 675 "On the procedure for establishing control over dotrimannym, transferring part 2.1 of Article 13 and part 6 of Article 14 of the Federal Law "On information, information technology and protection of information". vivedennyam system s exploitation;

b) work on the maintenance of the system during operation, including the work on uninstalling the software security of the system, on the implementation of rights to the software security of the system, the dismantling and decommissioning of the technical equipment of the system, the security of saving and false vikoristannya information resources systems;

Information about changes:

Resolution of the Order of the Russian Federation dated January 11, 2017 N 555 paragraph 23 was supplemented with subparagraph "c"

в) забезпечення захисту інформації відповідно до документації на систему та організаційно-розпорядчими документами щодо захисту інформації, у тому числі архівування інформації, що міститься в системі, знищення (прання) даних та залишкової інформації з машинних носіїв інформації та (або) знищення машинних носіїв інформації .

24. Yakshcho with regulatory legal acts of the Federal Federal Administrative Offenses of the federal federal, INNSHA, then the Termi Zberiannya Informatsi, to be in the bases of the Dani systems, is in charge of the Vikonavcho viconavicho I do not be able to bouti for the lines of the zero -forman information.

25. The line for the introduction of the system for operation cannot be earlier than the line for the completion of the remaining run, transferred by the legal act for the provision of the system for operation.